Follow us on Twitter Follow Us on Facebook

  DRC Home | HDRS | Applicants Guide (PDF) | Submittals Checklist (PDF) |Application Form (PDF) | Agendas

Euclid Corridor Design Review Case Report

UCI DEVELOPMENT | STOKES WEST

Back Return to Case List | Start Over | Print Report (PDF format)

Project Information

Euclid Corridor Case #  EC 2022-010

Address: NW Corner of Cedar & Stokes
Company: LDA architects
Architect: LDA architects
Description:
Notes:  

Committee Actions/Submissions

Date: March 24, 2022
Committee: Staff
Action Type: Initial Plan Submission
Conditions/Notes:  
 
Date: March 31, 2022
Committee: Local Design Review Committee
Action Type: Approved with Conditions
Conditions:  

1) Study grass bumpouts with the larger trees at entry; possibly reduce or adjust them for safety / visibility

2) Bike storage - design these areas and integrate with language from building and adjacent exterior spaces

3) Explore the opportunity for patios and green wall on first level townhome units (buffer space)

4) Explore bikd path or bike lanes related to alternate transportation modes and connection to existing neighborhood infrastructure

5) Study corner at Cedar & E 107 to alleviate a 'back of house' feel

6) Develop green space on Cedar and Stokes for next meeting

7) Develop the exterior mateial pallet and integrate into renderings

8) Note - investigate ways to improve crosswalks (off Carnegie onto Wilbur) by coordianting with city

 
Date: April 1, 2022
Committee: City Planning Commission
Action Type: Tabled
Conditions:  
Date: May 12, 2022
Committee: Staff
Action Type: Revised Plan Submission
Conditions/Notes:  
 
Date: May 19, 2022
Committee: Local Design Review Committee
Action Type: Approved with Conditions
Conditions:  

1) Further study landscaped space near corner of Cedar & E 107th

2) Consider the exterior ceiling of third floor regarding material color for greater warmth and contrast to add interest to building

 
Date: May 20, 2022
Committee: City Planning Commission
Action Type: Tabled
Conditions:  

The Planning Commission granted this project Schematic Design Approval on July 1, 2022.

Date: August 11, 2022
Committee: Staff
Action Type: Revised Plan Submission
Conditions/Notes:  

1st Pace, 2nd Holland

A: Strean, Solon, Pace, Holland, Brown, Augoustidis, Rothenberg.

 
Date: August 19, 2022
Committee: Local Design Review Committee
Action Type: Approved
Conditions:  
  • Return with landscaping and lighting plan
 
Date: August 19, 2022
Committee: City Planning Commission
Action Type: Approved with Conditions
Conditions:  

Approved incorporating the DRAC's comments.