Southeast Design Review Case Report
HOLY TRINITY BAPTIST CHURCH
Return to Case List | Start Over | Print Report (PDF format)
Project Information
Southeast Case # SE 2020-030
Address: | 3808 East 131st Street |
Company: | Adam Signs |
Architect: | same as contact |
Description: | Installation of a new monument sign. |
Notes: | |
Committee Actions/Submissions
Date: | July 20, 2020 |
Committee: | Local Design Review Committee |
Action Type: | Initial Plan Submission |
Conditions/Notes: | |
Date: | August 12, 2020 |
Committee: | Local Design Review Committee |
Action Type: | Tabled |
Conditions: | |
The committee voted to table the project to give the applicant time to prepare more detailed drawings showing how it will be installed. |
Date: | September 9, 2020 |
Committee: | Local Design Review Committee |
Action Type: | Revised Plan Submission |
Conditions/Notes: | |
Date: | September 23, 2020 |
Committee: | Local Design Review Committee |
Action Type: | Approved with Conditions |
Conditions: | |
This was not a part of the motion, but they will also need to show the landscape details around the sign that comply with the code. It was mentioned by the applicant, but was not shown on the plans. The committee made the recommendation with the understanding that the applicant would not be able to meet the 10 ft. setback requirements. |
|
Date: | October 2, 2020 |
Committee: | City Planning Commission |
Action Type: | Approved |
Conditions: | |