Southeast Design Review Case Report
BUCKEYE ROAD GREEN INFRASTRUCTURE PROJECT
Return to Case List | Start Over | Print Report (PDF format)
Project Information
Southeast Case # SE 2017-007
Address: | 9801 Buckeye Road |
Company: | NEORSD |
Architect: | tbd |
Description: | The Sewer District plans to construct a green infrastructure (GI) project containing underground stormwater detention at the intersection of Buckeye Road and Shaker Boulevard and large-scale green infrastructure stormwater detention basins at East 99th Street, East 100th Street, East 102nd Street and East 104th Street and Buckeye Road intersections. This $3.4 million (revised estimate, 1/17) project is designed to capture stormwater, before it enters the combined sewer system, and prevent 0.7 million gallons (revised estimate, 1/17) of combined sewage from discharging into the Doan Valley Tunnel System annually. The Sewer District, as part of its Combined Sewer Overflow (CSO) Consent Decree with the U.S. Environmental Protection Agency (USEPA) and Ohio Environmental Protection Agency (Ohio EPA), will construct and install GI control measures in addition to required gray infrastructure to further reduce combined sewer overflows within its combined sewer service area, which includes the majority of the City of Cleveland. Appendix 3 of the District’s CSO Consent Decree describes the GI requirement which mandates that the District capture at least 44 million gallons of additional CSO annually and spend at least $42 million on GI projects. |
Notes: | |
Committee Actions/Submissions
Date: | February 17, 2017 |
Committee: | Local Design Review Committee |
Action Type: | Initial Plan Submission |
Conditions/Notes: | |
Date: | February 22, 2017 |
Committee: | Local Design Review Committee |
Action Type: | Approved |
Conditions: | |
The committee requested that the Sewer District continue to work with the neighborhood agencies to educate residents on the project. |
|
Date: | March 3, 2017 |
Committee: | City Planning Commission |
Action Type: | Approved with Conditions |
Conditions: | |
Install lighting on site. If this cannot be done, return to staff. |