Northeast Design Review Case Report
DOROTHY WILSON FAMILY CENTER
Return to Case List | Start Over | Print Report (PDF format)
Project Information
Northeast Case # NE 2021-046
Address: | NW corner of Wade Park and E. 82nd |
Company: | architect Hakki, LTD |
Architect: | |
Description: | Seeking conceptual approval for at two-story, mixed-use structure. |
Notes: | |
Committee Actions/Submissions
Date: | December 14, 2021 |
Committee: | Staff |
Action Type: | Initial Plan Submission |
Conditions/Notes: | |
Voting Members Present
Project details presented by Ibrahim Hakki. Presented details on the site layout, massing, exisiting conditions, landscaping, parking, lighting, and intended uses.
Committee Questions, Comments, Concerns
Khrys Shefton from Famicos Fdn is available to state support for the project. Does have some inquiry about how a childcare operator will be attracted to the space, if they have other day care locations, what are their state ratings, and how will the retail spaces be programmed.
Kim Scott from City Planning is available to state support for the project and speak to the overall development of the plan. |
|
Date: | December 21, 2021 |
Committee: | Local Design Review Committee |
Action Type: | Conceptual Approval |
Conditions: | |
Motion to approve conceptually with the condition to study the main entrance way, study storefront mullion patterning, study overhang proportions and facia between roof and brick, study landscaping around perimeter, finalize roof material, study using a base plate for lighting, study signage proportions and placement, and add storefront windows for Wade Park facade and possibly the parking lot facade. |
|
Date: | January 7, 2022 |
Committee: | City Planning Commission |
Action Type: | Conceptual Approval |
Conditions: | |
Conceptual Approval with Conditions: Incorporate the DRAC's comments; also, study what happens along the streetscape; and think of ways of alleviating the cars near the outdoor playground. |