Northeast Design Review Case Report
DOLLAR GENERAL
Return to Case List | Start Over | Print Report (PDF format)
Project Information
Northeast Case # NE 2011-025
Address: | Superior & E 51st |
Company: | Zaremba |
Architect: | Zaremba |
Description: | |
Notes: | |
Committee Actions/Submissions
Date: | August 18, 2011 |
Committee: | Staff |
Action Type: | Initial Plan Submission |
Conditions/Notes: | |
Date: | August 30, 2011 |
Committee: | Staff |
Action Type: | Approved with Conditions |
Conditions: | |
Motion to approve the project with the following conditions: 1). Signage on the building is to be reduced from a height of 36” to 30”. 2). The existing concrete walk in the front tree lawn is to be removed and replaced with grass. 3). The windows along the Superior (south elevation) are to be raised to the top of the awning and real glass is to be used where it can be applied. 4). Bulkhead is to be extended around the entire building (north, east, and west elevations. 5). The white panel color should be darkened. 6). The wall pack light fixtures are to be placed on each pilaster. 7). The parking stripes at the front door entrance should at the very least be an elevated concrete walk, if not landscaped. 8). In the middle section, above the bulkhead, a half-height block with vertical score should be used. 9). Columns should be wrapped around the rear of the building (north elevation). |