Follow us on Twitter Follow Us on Facebook

  DRC Home | Applicants Guide (PDF) | Submittals Checklist (PDF) |Application Form (PDF) | Agendas

Euclid Corridor Design Review Case Report

9410 HOUGH AMENITY BUILDING

Back Return to Case List | Start Over | Print Report (PDF format)

Project Information

Euclid Corridor Case #  EC 2022-001

Address: 9310 Hough Ave.
Company: RDL Architects
Architect: RDL Architects and Sullivan Land Services
Description:
Notes:  

Committee Actions/Submissions

Date: January 13, 2022
Committee: Staff
Action Type: Initial Plan Submission
Conditions/Notes:  

The Planning Commission granted Schematic Design Approval to this project on 1/21/2022.

 
Date: January 20, 2022
Committee: Local Design Review Committee
Action Type: Approved with Conditions
Conditions:  

1) Study west & south elevations to better articulate materials & patterning.

2) Consider how a second ingress/egress to building could be practical.

3) Provide more accurate renderings that reflect the patterning of materials.

4) Consider an alternate to the standing seam 12" on center metal panel - find material that relates to flat appearance to match existing building or consider corrugated panel with a close pattern grouping.

Date: January 27, 2022
Committee: Staff
Action Type: Revised Plan Submission
Conditions/Notes:  
 
Date: February 3, 2022
Committee: Local Design Review Committee
Action Type: Approved with Conditions
Conditions:  

*** Note - there was not a quorum for this project review.

Conditions:

1) provide final landscape plan.

2) provide final lighting plan with cut sheet of fixture type(s).

2) any signage should be reviewed by this committee.

 

The non-voting representative from MidTown was Karis Tzeng, not Joyce Huang.

 
Date: February 4, 2022
Committee: City Planning Commission
Action Type: Approved with Conditions
Conditions:  

Approval incorporating the DRAC's comments, even though the DRAC did not have a quorum.