Euclid Corridor Design Review Case Report

MIDTOWN FOOD TRUCK PARK

Back Return to Case List | Start Over | Print Report (PDF format)

Project Information

Euclid Corridor Case #  EC 2021-030

Address: 7412 Carnegie Ave
Company:
Architect:
Description:
Notes:  

Committee Actions/Submissions

Date: October 28, 2021
Committee: Staff
Action Type: Initial Plan Submission
Conditions/Notes:  
 
Date: November 4, 2021
Committee: Local Design Review Committee
Action Type: Tabled
Conditions:  

Provide a drawing that is accurate in scale and dimensions.

Relocate play area on the site so it can be more protected, that eliminates interface with parked cars or heavy vehicular traffic along Carnegie.

Reconfigure handicap parking spaces - they will require at least 8 feet between the two stalls.

Study the amount of concrete on the site and consider reducing concrete and add green space for a more pleasant user (customers & vendors) experience.

Date: November 11, 2021
Committee: Staff
Action Type: Revised Plan Submission
Conditions/Notes:  
 
Date: November 18, 2021
Committee: Local Design Review Committee
Action Type: Schematic Design Approval
Conditions:  

Applicant will return with information regarding drainage for the site.

Date: October 13, 2022
Committee: Staff
Action Type: Resubmittal
Conditions/Notes:  
 
Date: October 20, 2022
Committee: Local Design Review Committee
Action Type: Tabled
Conditions:  

Several concerns were expressed and need resolve including:

1) How pedestrian traffic will flow through the site. There may be conflicts between autos and patrons with current layout.

2) Delineate areas (seating, amphitheater, etc) by using texture or colors on concrete

3) Consider enlivening building with color instead of gray

4) It seems like there will be an issue with not enough parking to accommodate the audience the features & programming are intended to draw

Staff will follow up and meet with project team to discuss the site configuration, use, any non-conforming issues that may arise.