Euclid Corridor Design Review Case Report
DUNKIN DONUT CARNEGIE
 Return to Case List | Start Over
         | Print Report   (PDF format)
 Return to Case List | Start Over
         | Print Report   (PDF format)
Project Information
Euclid Corridor Case # EC 2018-039
| Address: | 7908 Carnegie Avenue | 
| Company: | Kolbrook Design, INC. | 
| Architect: | Kolbrook Design, INC | 
| Description: | |
| Notes: | |
Committee Actions/Submissions
| Date: | October 25, 2018 | 
| Committee: | Staff | 
| Action Type: | Initial Plan Submission | 
| Conditions/Notes: | |
| Date: | November 1, 2018 | 
| Committee: | Local Design Review Committee | 
| Action Type: | Tabled | 
| Conditions: | |
| Committee wanted additional study to the building siting as there are still concerns with potential traffic conflicts. Give consideration to moving the building further back on the site. Reduce parking - parking spaces shown exceed what is required. Consider making driveways from Carnegie right in & right out only. Additionally, the presentation for the demolitions were incomplete. | |
| Date: | November 8, 2018 | 
| Committee: | Staff | 
| Action Type: | Revised Plan Submission | 
| Conditions/Notes: | |
| Date: | November 15, 2018 | 
| Committee: | Local Design Review Committee | 
| Action Type: | Schematic Design Approval | 
| Conditions: | |
| This schematic approval was given with conditions: 1) Provide a pedestrian walkeway from E 79th Street to the store - we anticipate signifianct pedestrian traffic from the Farifax neighborhood. 2) Expand patio area too accommodate a larger outdoor seating area. 3) Include bike rack(s) in the site plan. 4) Widen walkway from store to Carnegie. 5) Include a tree lawn with trees along Carnegie. This will enhance the area aesthetics and be complimentary to the multi-family building to the east. 
 There is still a great concern about the traffic pattern flow in and out of the development site considering the volume of traffic on Carnegie. | |
| Date: | November 16, 2018 | 
| Committee: | City Planning Commission | 
| Action Type: | Approved with Conditions | 
| Conditions: | |
| Schematic Design Approval while incorporating the DRAC's comments. | |
| Date: | November 29, 2018 | 
| Committee: | Staff | 
| Action Type: | Revised Plan Submission | 
| Conditions/Notes: | |
| Date: | December 6, 2018 | 
| Committee: | Local Design Review Committee | 
| Action Type: | Approved with Conditions | 
| Conditions: | |
| Conditions: 1) Provide additional street trees on Carnegie Ave. frontage 2) Look at softening the parking lot interior corner off E 79th Street (area that abuts land that is not part of this development). 3) Change pylon sign to a monument sign - the monument sige will be reviewed for approval separately from this total development project. | |
| Date: | December 7, 2018 | 
| Committee: | City Planning Commission | 
| Action Type: | Approved | 
| Conditions: | |