Follow us on Twitter Follow Us on Facebook

  DRC Home | Applicants Guide (PDF) | Submittals Checklist (PDF) |Application Form (PDF) | Agendas

Euclid Corridor Design Review Case Report

MIDTOWN TRU HILTON

Back Return to Case List | Start Over | Print Report (PDF format)

Project Information

Euclid Corridor Case #  EC 2017-016

Address: 6975 Euclid Ave.
Company: Kaczmar architects
Architect: Kaczmar architects
Description:
Notes:  

Committee Actions/Submissions

Date: June 27, 2017
Committee: Staff
Action Type: Initial Plan Submission
Conditions/Notes:  
 
Date: July 6, 2017
Committee: Local Design Review Committee
Action Type: Tabled
Conditions:  

Feedback:

> Vehicular traffic from Euclid west headed east - no left turn across median

> Transit riders accessing bldg entry from Euclid: stop is between 71st & 73rd, would need to walk from there to E 69th to main entry in rear

> Need to do more on bldg exterior (enhance) to make it architecturally interesting

> Drivit is the wrong material to use

> Prototype example is cleaner looking w/less angulation, more cohesive

> Include sidewalk on E 70th side

> Study additional entry on Euclid Ave.

Date: July 13, 2017
Committee: Staff
Action Type: Revised Plan Submission
Conditions/Notes:  
 
Date: July 20, 2017
Committee: Local Design Review Committee
Action Type: Schematic Design Approval
Conditions:  

With conditions:

1) Study SE corner to relocate window to east facade or flip stairway location from the north to south side.

2) Consider height of parapet proportions.

 
Date: July 21, 2017
Committee: City Planning Commission
Action Type: Approved
Conditions: