Euclid Corridor Design Review Case Report
LINK 59 CAMPUS MASTER PLAN
Return to Case List | Start Over | Print Report (PDF format)
Project Information
Euclid Corridor Case # EC 2015-034
Address: | E 57th through E 63rd Streets, between Chester & Euclid Avenues |
Company: | Geis Companies (GLSD Architects) |
Architect: | GLSD Architects & Geis Construction, Geis Companies |
Description: | |
Notes: | |
Committee Actions/Submissions
Date: | September 24, 2015 |
Committee: | Staff |
Action Type: | Initial Plan Submission |
Conditions/Notes: | |
Date: | October 1, 2015 |
Committee: | Local Design Review Committee |
Action Type: | Conceptual Approval |
Conditions: | |
Conditions: 1) Provide more welcoming campus entryways from Chester & Euclid by reducing the distinct 45 degree angle of each corner. 2) Provide additional trees in parking lot interiors. 3) Include landscape treatments along all other campus streets (E 57th, E 61st & E 63rd) 4) Insure that landscape requirements are met via city code campuswide. 5) Define building heights/massing (possible higher density) in future layout. 6) Insure developer provides a more detailed master plan updates as project progresses (including higher density, future parking needs, lighting, sign placement, etc.)
|
|
Date: | October 2, 2015 |
Committee: | City Planning Commission |
Action Type: | Conceptual Approval |
Conditions: | |
With best efforts to meet DRAC's comments. |
Date: | March 23, 2016 |
Committee: | Staff |
Action Type: | Revised Plan Submission |
Conditions/Notes: | |
Date: | March 31, 2016 |
Committee: | Local Design Review Committee |
Action Type: | Approved with Conditions |
Conditions: | |
Recognizing the evolving nature of master plans, the plan approval was limited to the following: 1) Only approval of building placement & location of buildings 1-4 2) Approval of E 59th Street infrastructure that provides access to buildings 1-4 3) Approval of any infrastructure in the public right-of-way on E 59th Street and connecting to buildings 1-4 |
|
Date: | April 1, 2016 |
Committee: | City Planning Commission |
Action Type: | Approved |
Conditions: | |