East Design Review Case Report
CITY MISSION MASTERPLAN
Return to Case List | Start Over | Print Report (PDF format)
Project Information
East Case # EAST 2018-047
Address: | E 59th - E 61st between Hawthorne & Thackeray |
Company: | HSB Architects + Engineers |
Architect: | HSB Architects + Engineers - Bob Bajko / Gabriel Fey |
Description: | |
Notes: | |
Committee Actions/Submissions
Date: | September 18, 2018 |
Committee: | Staff |
Action Type: | Initial Plan Submission |
Conditions/Notes: | |
Date: | September 25, 2018 |
Committee: | Local Design Review Committee |
Action Type: | Approved with Conditions |
Conditions: | |
1) Continue study of parking between Bldgs A & C - remove parking aisle along driveway entry, south of building C. 2) Study how to frame north/south pathway at E 61st Street to articulate the neighborhood connection and significance. 3) Increase access of Play Area from all buildings with improved functionality - right now it seems separated from other buildings. 4) Provide an oasis of comfort and safety on campus with additional trees in final landscape design. 5) When determining building materials, consider materials of related housing stock. |