East Design Review Case Report
GREEN AMBASSADOR – URBAN AGRICULTURE GREEN INFRASTRUCTURE PROJECT
Return to Case List | Start Over | Print Report (PDF format)
Project Information
East Case # EAST 2014-011
Address: | Kinsman Ave (E. 79th - E. 83rd) |
Company: | NEORSD |
Architect: | NEORSD |
Description: | The Project proposes maximizing stormwater capture from the surrounding drainage area and directing it through a series of localized stormwater control features that are designed to infiltrate, cleanse, temporarily store and redirect stormwater runoff directly to the environment via the existing Kingsbury Run SWO. |
Notes: | |
Committee Actions/Submissions
Date: | April 15, 2014 |
Committee: | Staff |
Action Type: | Initial Plan Submission |
Conditions/Notes: | |
Date: | April 22, 2014 |
Committee: | Local Design Review Committee |
Action Type: | Approved |
Conditions: | |
Motion to approve the project as presented, with the recommendation that trees be planted in some form along Kinsman. |