East Design Review Case Report
GREEN AMBASSADOR – URBAN AGRICULTURE GREEN INFRASTRUCTURE PROJECT
Return to Case List | Start Over
| Print Report (PDF format)
Project Information
East Case # EAST 2014-011
| Address: | Kinsman Ave (E. 79th - E. 83rd) |
| Company: | NEORSD |
| Architect: | NEORSD |
| Description: | The Project proposes maximizing stormwater capture from the surrounding drainage area and directing it through a series of localized stormwater control features that are designed to infiltrate, cleanse, temporarily store and redirect stormwater runoff directly to the environment via the existing Kingsbury Run SWO. |
| Notes: | |
Committee Actions/Submissions
| Date: | April 15, 2014 |
| Committee: | Staff |
| Action Type: | Initial Plan Submission |
| Conditions/Notes: | |
| Date: | April 22, 2014 |
| Committee: | Local Design Review Committee |
| Action Type: | Approved |
| Conditions: | |
Motion to approve the project as presented, with the recommendation that trees be planted in some form along Kinsman. |
|