Project Information

Downtown/Flats Case #  DF 2021-016

Address: Downrtown Cleveland | Jacobs Block & Weston Block
Company: Vocon
Architect: Pickard Chilton, HGA, Vocon | Welty / Gibane JV
Description:

The construction of a new corporate headquaters complex.

Notes:  

Phase I


 


Tim Muckley, Sherwin Williams: 216-515-7415, timothy.r.muckley@sherwin.com


Nanc Clayton, Pickard Chilton: 203-786-8634, nclayton@pickardchilton.com

Committee Actions/Submissions

Date: July 7, 2021
Committee: Staff
Action Type: Initial Plan Submission
Conditions/Notes:  
 
Date: July 20, 2021
Committee: Local Design Review Committee
Action Type: Approved with Conditions
Conditions:  
  • Approval excludes the Northwest Block
  • Applicant undertake a traffic study and provide the information to the committee
  • Applicant study the height and massing of the pavillion
  • Applicant study potenial public access to the roof of the pavillion
  • Applicant undertake a circulation study for the site (pedestrian & multi-modal)
  • Applcant study and provide renderings of public realm intergration at street level
Date: September 7, 2021
Committee: Staff
Action Type: Initial Plan Submission
Conditions/Notes:  
 
Date: September 14, 2021
Committee: Local Design Review Committee
Action Type: Approved with Conditions
Conditions:  

(3) Seperate Motions:

Motion 1: Tower Schematic Approval - Approve

Motion 2: North Block Schematic Approval - Approve w/ Conditions

  • Study the increase of 1'-0" of height to the 1st floor of the garage building.
  • Study for the potential of the garage to receive additional floors in the future by strengthening the foundation and structure.
  • Conider a temporary scrim to be approved and which can be changed when permanent screening is provided on the North and West face of the garage facade.
  • Continue the study of devloping the hardscaping and pedestrian experience along the vacated Frankfort Ave.

Motion 3: Pavilion Block Schematic Approval - Approve w/ Conditions

  • Study the potential of raising the roof of the center portion fo the Pavilion.
  • Study the roof overhangs on the North and South facades of the Pavilion.
  • Refine decorative ballasted roofing use on the pavilion and the potentiol of green roofing.