Project Information

Downtown/Flats Case #  DF 2019-063

Address: Carter Road
Company: The NRP Group LLC
Architect: BKV Group
Description:

The construction of new residential structures on existing vacant land.

Notes:  

Committee Actions/Submissions

Date: July 9, 2019
Committee: Staff
Action Type: Initial Plan Submission
Conditions/Notes:  

Proposal withdrawn by Applicant

 
Date: July 18, 2019
Committee: Local Design Review Committee
Action Type: No Action Taken
Conditions:  
Date: September 26, 2019
Committee: Staff
Action Type: Initial Plan Submission
Conditions/Notes:  
 
Date: October 3, 2019
Committee: Local Design Review Committee
Action Type: Approved with Conditions
Conditions:  
  • Building 2 and Building 1 should be similiar and both be a 'U' shape.
  • Study the (2) story garage and townhome further.  Look to see if improvements can be made which will make it feel more hlistic with the rest of the site.
  • Study the closeness of the buildings and see if there is some way to provide some additional distance between elements of infrastructure so as not to feel so tight.
Date: October 10, 2019
Committee: Staff
Action Type: Initial Plan Submission
Conditions/Notes:  

Public Comments:

Scott Aylesworth: Questions the public use of the green parking area and would like to know if the applicant will be addressing permeable pavers/ surfaces to help reduce storm water.

 

Committee Comments:

  • As the first construction, it is imperative that this project sets the proper tone for the peninsula.
  • The site still feels dense, the landscaping should be more apparent to help it feel more open.
 
Date: October 17, 2019
Committee: Local Design Review Committee
Action Type: Approved with Conditions
Conditions:  
  • Study materials and their interplay across the site to create the feeling of a neighborhood.
 
Date: October 18, 2019
Committee: City Planning Commission
Action Type: Schematic Design Approval
Conditions:  

Approved with Conditions: 1) incorporate pedestrian path flanked by townhomes after moving parking garage to the west 2)futher study bike path 3) consider adding a restaraunt space 4) think about bike parking in garage and possible queing for Uber/Lyft

Date: March 4, 2020
Committee: Staff
Action Type: Initial Plan Submission
Conditions/Notes:  
 
Date: April 30, 2020
Committee: Local Design Review Committee
Action Type: Approved with Conditions
Conditions:  

Applicant to submit corrected digital boards of material along with photos of materials to staff for distribution to committee.   The applicant shall also study the exterior façade of the buildings and explore possible simplification of the palette along with studying the integration of the mechanical louvers to the façade and overall color utilization on all buildings.


Final Approval submissions will be needed for Landscaping, Lighting and Signage.

 
Date: February 4, 2022
Committee: City Planning Commission
Action Type: Approved with Conditions
Conditions:  

Buildings are Approved; applicant to address connectivity/landscape plan, overall master plan and parking. Site/landscape plan to return for Final Approval. Landscape Plan approved 3/18/22.