Follow us on Twitter Follow Us on Facebook

  DRC Home | Applicants Guide (PDF) | Submittals Checklist (PDF) |Application Form (PDF) | Agendas

Downtown/Flats Design Review Case Report

HOT MIX ASPHALT PLANT

Back Return to Case List | Start Over | Print Report (PDF format)

Project Information

Downtown/Flats Case #  DF 2018-011

Address: 650 Harrison
Company: The Shelly Company
Architect: Clarence Watkins, PE
Description:

In 1990, Lake Erie Asphalt started operation of a Hot Mix Asphalt Plant on this site. That plant was in operation until the end of the 2012 production season when it was forced to close due to the 4-year reconstruction of the Innerbelt Bridge. The Shelly Company desires to resume HMA operations on site with a reduced footprint batch plant operation starting December 1, 2018.

Notes:  

Committee Actions/Submissions

Date: December 11, 2017
Committee: Staff
Action Type: Initial Plan Submission
Conditions/Notes:  
 
Date: December 27, 2017
Committee: Staff
Action Type: Administrative Approval
Conditions: