Follow us on Twitter Follow Us on Facebook

  DRC Home | Applicants Guide (PDF) | Submittals Checklist (PDF) |Application Form (PDF) | Agendas

Downtown/Flats Design Review Case Report

CHANGE OF USE AND ADAAG RAMP

Back Return to Case List | Start Over | Print Report (PDF format)

Project Information

Downtown/Flats Case #  DF 2017-053

Address: 2111 Center St.
Company: redhouse studio
Architect: redhouse studio
Description:

No interior work, all facets are in place for Change of Use except an accessible route to and from building is needed. The proposed work is for an ADAAG compliant ramp and new concrete stair to replace deteriorating wood stair that is not universally accessible.

Notes:  

Committee Actions/Submissions

Date: July 10, 2017
Committee: Staff
Action Type: Initial Plan Submission
Conditions/Notes:  
 
Date: July 10, 2017
Committee: Staff
Action Type: Administrative Approval
Conditions: