Follow us on Twitter Follow Us on Facebook

  DRC Home | Applicants Guide (PDF) | Submittals Checklist (PDF) |Application Form (PDF) | Agendas

Downtown/Flats Design Review Case Report

ADDITIONAL ROCK BOX INSTALLATION

Back Return to Case List | Start Over | Print Report (PDF format)

Project Information

Downtown/Flats Case #  DF 2016-083

Address: 901 Lakeside Avenue
Company: New Vista Enterprises
Architect: Sdi Structures/Osborn Engineering
Description:

Trenching from power source to installation site. Run conduit from power source up through concrete footer. Pour concrete footers with wire cage. Affix Rock Box to threaded rods. Replace concrete pads. Run wire for power.

Notes:  

This Rock Box proposal was not part of the orginal set we received and reviewed from LAND Studio.

Committee Actions/Submissions

Date: July 6, 2016
Committee: Staff
Action Type: Initial Plan Submission
Conditions/Notes:  

Per Director Collier.

 
Date: July 6, 2016
Committee: Staff
Action Type: Administrative Approval
Conditions: