Downtown/Flats Design Review Case Report
HUNTINGTON GARAGE UNDERGROUND CONNECTOR TO HILTON HOTEL
Return to Case List | Start Over | Print Report (PDF format)
Project Information
Downtown/Flats Case # DF 2015-082
Address: | 100 Lakeside Avenue |
Company: | Osborn Engineering |
Architect: | Osborn Engineering |
Description: | Installing a tunnel to connect the Convention Center Hotel to the Huntington Garage underneath Lakeside Avenue. |
Notes: | |
Have gone through Preliminary Review with staff on 9/21/15 |
Committee Actions/Submissions
Date: | September 25, 2015 |
Committee: | Staff |
Action Type: | Initial Plan Submission |
Conditions/Notes: | |
Suggestion: study lane widths going to 11 ft. lanes to accomodate more space along drive edge for potential pedestrian movement. |
|
Date: | October 1, 2015 |
Committee: | Local Design Review Committee |
Action Type: | Approved |
Conditions: | |
Date: | October 2, 2015 |
Committee: | City Planning Commission |
Action Type: | Approved with Conditions |
Conditions: | |
Incorporating the DRAC's suggestions and comments. Schematic Design Approval. |
Date: | December 10, 2015 |
Committee: | Local Design Review Committee |
Action Type: | Initial Plan Submission |
Conditions/Notes: | |
Date: | December 17, 2015 |
Committee: | Local Design Review Committee |
Action Type: | Approved |
Conditions: | |
Date: | December 18, 2015 |
Committee: | City Planning Commission |
Action Type: | Approved |
Conditions: | |