Downtown/Flats Design Review Case Report

FIRST ENERGY STADIUM RENOVATIONS PHASE 2

Back Return to Case List | Start Over | Print Report (PDF format)

Project Information

Downtown/Flats Case #  DF 2014-121

Address: 100 Alfred Lerner Way
Company: Gensler
Architect: Gensler/Turner Construction
Description:

Modernization of interior clubs, team store, ticket office, common areas, and suites by erecting new facade on ground level of south side, new interior partitions and adding new finishes (carpet, paint, graphics, lighting, MEP systems as needed, and AV systems.

Addendum #2: Perform MEPAV enabling work (relocation/abandonment of conduits, piping, ductwork, and equipment) for demolition and disassembly of selective interior and exterior partitions as well as interior finishes in selected clubs, suites, and common spaces.

Notes:  

Committee Actions/Submissions

Date: December 11, 2014
Committee: Staff
Action Type: Initial Plan Submission
Conditions/Notes:  
 
Date: December 18, 2014
Committee: Local Design Review Committee
Action Type: Incomplete Plan Notification
Conditions:  

Lacked existing conditions photos, elevations, and sections for proposed facade changes on Stadium. Committee gave Conceptual Approval on sign locations, but withheld approval of facade changes and canopies.

 
Date: December 19, 2014
Committee: City Planning Commission
Action Type: Approved
Conditions:  

Jennifer Coleman, representing the DRAC, said that the revised plans were sufficient for DRAC acceptance. With that information, Planning Commission approved.