Downtown/Flats Design Review Case Report
FIRST ENERGY STADIUM RENOVATIONS PHASE 2
Return to Case List | Start Over | Print Report (PDF format)
Project Information
Downtown/Flats Case # DF 2014-121
Address: | 100 Alfred Lerner Way |
Company: | Gensler |
Architect: | Gensler/Turner Construction |
Description: | Modernization of interior clubs, team store, ticket office, common areas, and suites by erecting new facade on ground level of south side, new interior partitions and adding new finishes (carpet, paint, graphics, lighting, MEP systems as needed, and AV systems. Addendum #2: Perform MEPAV enabling work (relocation/abandonment of conduits, piping, ductwork, and equipment) for demolition and disassembly of selective interior and exterior partitions as well as interior finishes in selected clubs, suites, and common spaces. |
Notes: | |
Committee Actions/Submissions
Date: | December 11, 2014 |
Committee: | Staff |
Action Type: | Initial Plan Submission |
Conditions/Notes: | |
Date: | December 18, 2014 |
Committee: | Local Design Review Committee |
Action Type: | Incomplete Plan Notification |
Conditions: | |
Lacked existing conditions photos, elevations, and sections for proposed facade changes on Stadium. Committee gave Conceptual Approval on sign locations, but withheld approval of facade changes and canopies. |
|
Date: | December 19, 2014 |
Committee: | City Planning Commission |
Action Type: | Approved |
Conditions: | |
Jennifer Coleman, representing the DRAC, said that the revised plans were sufficient for DRAC acceptance. With that information, Planning Commission approved. |