Downtown/Flats Design Review Case Report

STATIC VAR COMPENSATOR FACILITY

Back Return to Case List | Start Over | Print Report (PDF format)

Project Information

Downtown/Flats Case #  DF 2014-103

Address: 6800 S. Marginal Road
Company: American Transmission
Architect: Burns and McDonnell Engineering
Description:

American Transmission Systems, Inc., a FirstEnergy company, proposes to conduct grading and site preparation activities for the ABB Group to construct and operate a new Static VAR Compensator (SVC) facility on the site of an existing coal storage area associated with the Lakeshore Power Plant. The SVC facility will be fenced area containing electrical equipment, including an unoccupied electrical control building. The SVC facility will be constructed on Lakeshore Power Plant property which is zoned General Industry by the City of Cleveland.

Notes:  

Committee Actions/Submissions

Date: October 8, 2014
Committee: Staff
Action Type: Initial Plan Submission
Conditions/Notes:  
 
Date: October 8, 2014
Committee: Staff
Action Type: Administrative Approval
Conditions: