Project Information
Downtown/Flats Case # DF 2014-001
Address: | Old River Road in the Flats |
Company: | Metro Consulting |
Architect: | |
Description: | Permit application for the building approved July 18, 2014. |
Notes: | |
Elelvations approved at conceptual approval stage. Final Approval held back until lighting, signage, landscaping, and streetscape elements are brought back. |
Committee Actions/Submissions
Date: | April 3, 2014 |
Committee: | Staff |
Action Type: | Revised Plan Submission |
Conditions/Notes: | |
Date: | April 3, 2014 |
Committee: | Local Design Review Committee |
Action Type: | Conceptual Approval |
Conditions: | |
Motion for conceptual approval. Special consideration needed for panels over storefront, above the canopy. Applicant will return for signage, lighting, landscaping & streetscape. |
|
Date: | April 4, 2014 |
Committee: | City Planning Commission |
Action Type: | Approved with Conditions |
Conditions: | |
Incoporating the DRAC's comments. Project to return for Final Approval. |
Date: | March 12, 2015 |
Committee: | Staff |
Action Type: | Initial Plan Submission |
Conditions/Notes: | |
Date: | March 19, 2015 |
Committee: | Local Design Review Committee |
Action Type: | Approved with Conditions |
Conditions: | |
-committee suggested to review the stroke size on the bottom lettering portion of the sign. |
|
Date: | March 20, 2015 |
Committee: | City Planning Commission |
Action Type: | Approved with Conditions |
Conditions: | |
Incorporating the DRAC's comments. |
Date: | April 2, 2015 |
Committee: | Staff |
Action Type: | Revised Plan Submission |
Conditions/Notes: | |
All street amenities and lighting plan (CPP) will be coming for final approval. Signage and patio for each storefront owner will be submitting seperatly |
|
Date: | April 9, 2015 |
Committee: | Local Design Review Committee |
Action Type: | Approved with Conditions |
Conditions: | |
-Approved the overall design. Conditions: Return with infrastructure detail for both the streetscape and landscaping (proposed raised curbs, depth of trenches); clearly render the public spaces in the site plan indicating what is developer responsibility and private tenant responsibility; provide sustainability details as to how the permeable pavers will be maintained and how snow removal will occur. |
|
Date: | April 17, 2015 |
Committee: | City Planning Commission |
Action Type: | Approved with Conditions |
Conditions: | |
Approved incorporating the DRAC's comments.
Note: this project was Tabled by CPC on April 10, 2015. |