Project Information
Downtown/Flats Case # DF 2011-082
Address: | 50 Public Square |
Company: | Process Creative Studios |
Architect: | Process Creative Studios |
Description: | No permit application as of November 16, 2011. |
Notes: | |
Committee Actions/Submissions
Date: | November 15, 2011 |
Committee: | Staff |
Action Type: | Initial Plan Submission |
Conditions/Notes: | |
Date: | December 1, 2011 |
Committee: | Staff |
Action Type: | Tabled |
Conditions: | |
Tabled for further study with following recommendations: 1) could repair existing materials in lieu of proposal; 2) need to see entire family of street furniture; 3) work on construction joints, share scoring plan for concrete; 4) orient bicyclists to new racks; 5) iron tree grates are preferred to rubber tree grates; 6) need more information on planters and plantings; and 7) plans should say "Existing trees to remain" or if trees will be removed, that they "will be replaced by trees very similar in caliper size." |
|
Date: | December 2, 2011 |
Committee: | City Planning Commission |
Action Type: | Approved with Conditions |
Conditions: | |
Work out details with DRAC. |
Date: | December 13, 2011 |
Committee: | Staff |
Action Type: | Revised Plan Submission |
Conditions/Notes: | |
Date: | December 15, 2011 |
Committee: | Local Design Review Committee |
Action Type: | Approved with Conditions |
Conditions: | |
Allow a period of 18 months [to June 15, 2013] to assess tree grates and to replace with more standard tree grates if synthetic material shows signs of shrinkage or degradation of materials; maintain current shape and size of tree openings; look at palette of colors to possibly make more decorative (send to DRAC via email); expectation that Forest City will have future interaction with Public Square committee. |